(WAND) — The Illinois Department of Transportation has announced that the project on Illinois 121 through Mount Zion, from U.S. 36 to the south limits of Mount Zion, will resume Monday, April 15.
The upgraded traffic signals and sidewalk ramps included in this $11.9 million project have been completed, with the milling, resurfacing and striping remaining.
Related Links
One lane of traffic will be maintained in each direction with traffic control signs, arrow boards and barricades directing traffic. Benefits from this project include a smoother driving surface and safer intersections. The project is expected to be completed by mid-June.
Drivers can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.
To find out more about current construction zones, visit this page from IDOT.
Copyright 2024. WAND TV. All rights reserved.